Steve doing his imitation of a high wire walker (21 May 2000). |
|
|
Jimmy Carter puzzling over what he got himself into when he offered to help. |
Aligning the end truss... |
|
|
and securing it to the wall. |
A distant view from the driveway. |
|
|
A close view of me doing what I was doing most the time (standing around wondering what I was doing). |
Jeremy trying to maintain the balance of a truss while it was moved into position. |
|
|
A hillside view of the roof (25 May 2000). |
Dad an me starting to put OSB on the gable end. |
|
|
Me finishing up laying the roofing OSB. |
An inside view looking out (of me doing my carpenter imitation). |
|
|
Dad and me installing the drip edge. |
Roger and me installing shingles. |
|
|
Dad, Steve, Roger, and me installing more shingles (before the rain chased us off the roof). |
After the rain let up a bit we started on the hillside shingles (29 May 2000). |
|
|
With the help of Dad, Steve & Marlene, Roger, and Uncle John the shingles on this side got done quicker. |
Everyone standing around watching Steve start installing the ridge vent. |
|
|
We started the soffit and facia work on the 3rd of June. |
Trying to keep the critters from taking over the house, we put the doors on the main floor...but still haven't installed the basement doors (4 June 2000). |
|